26-04-17 13:32
2
0человекДобавлено в избранное
0человекОтвет получен
Ответить на требованияТип услуги:
E - Услуги по инженерному проектированию
Отрасль:
Генеральное подрядное исполнение и управление проектами EPC
Страна/регион:
Пакистан

Крайний срок(GMT+8 Китайское стандартное время): 2026-05-14,Ответьте как можно скорее, чтобы получить приоритетное рассмотрение.
Оставшееся15День(и)
Просмотреть оригиналThe core service requirements of this project revolve around the full lifecycle of technology, design, and procurement for the joint production facility. We will select a partner through a bidding process to provide integrated supporting services. The core service content includes: providing core technology and relevant usage rights adapted for the joint production of 200,000 tons of soda ash and 25,000 tons of baking soda; optimizing the process scheme based on the project's actual conditions to address key issues such as material coordination and energy consumption control in the co-production of the two products, ensuring an efficient and compliant production process; completing the project's basic and detailed design in strict accordance with local Pakistani chemical industry regulations, environmental and safety standards, and our requirements, issuing design documents that meet construction needs, with a focus on the design of core units such as soda ash calcination, carbonation, and baking soda synthesis and drying, to ensure smooth construction implementation; and assisting us in the selection and procurement of core production equipment required for the project, covering key equipment and supporting instruments such as ammonia stripping towers, carbonation towers, and dryers, to ensure equipment performance aligns with project capacity requirements and seamlessly adapts to the production process, guaranteeing the project's smooth progress and on-time commissioning.
Ваш опубликованный запрос находится на рассмотрении, и платформа завершит проверку и уведомит вас в течение 24 часов.
Ответить на требования
Больше рекомендацийArc'teryx Chemical Co., Ltd.
• Оставшееся114День(и)
3
0
E - Услуги по инженерному проектированию
New Zealand Marsden Point Biorefinery (Northland Region)
• Оставшееся1День(и)
3
0
E - Услуги по инженерному проектированию
P - Услуги по закупке оборудования

























